Package Deye 6 kW single phase · without battery · 14 × 460 W · without installation
Package contents
| Component | Model and details | Quantity |
|---|---|---|
| Solar panels | Canadian Solar CS6.2-48TD-460 · 460 WTechnical document below Total power: 6.44 kWp. | 14 pcs. |
| Inverter | Deye SUN-6K-SG05LP1-EU-AM2-P · 6 kW | 1 pcs. |
Not included
- Storage battery. A compatible battery can be quoted separately.
- Installation, commissioning and grid-connection paperwork are not included in this equipment package.
Optional extras
- Battery Pytes E-BOX-48100R or Deye SE-G5.1PRO-B, offered separately after checking the configuration.
Package conditions
- Transport, delivery time and availability shall be confirmed prior to the order.
- Equipment and installation warranty terms are confirmed separately in the quotation and supplied documents.
- Accessories not listed in the table, including protection devices, distribution boards, additional cabling and monitoring, must be confirmed separately.
Description
Deye SUN-6K-SG05LP1-EU-AM2-P · 6 kW. 14 panels × 460 W in total 6.44 kWp. The battery is not included. Installation work is not included.
The electrical configuration, cable tracks and equipment positioning shall be established for the installation location. Backup depends on battery, connected consumers and inverter configuration; inverter power is not battery capacity.
Technical specifications
Package configuration
- Package Reference
- Kit-6-14-X
- Inverter rated power AC
- 6 kW
- Connection
- Single-phase
- Operation
- Hybrid
- Installation
- Not included
- Number of panels
- 14
- Power per panel
- 460 W
- Total power panels DC
- 6.44 kWp
- Nominal storage included
- 0 kWh
- Number of batteries / modules
- Battery not included
Main equipment
- Inverter / all-in-one model
- Deye SUN-6K-SG05LP1-EU-AM2-P · 6 kW
- Battery voltage class
- Low Voltage (LV)
Inverter
- Battery range
- 40–60 V
PDF documents
The files and manuals are for the components indicated. A unique PDF of the entire package has not been identified. The structure, cables and protections shall be documented in the final project.















